Electrical Engineering MCQ on Power Generation MCQ Part 6
Which of following statement is correct about hydroelectric plant
Which of following statement is correct about hydroelectric plant:
- Its initial cost is high and operating cost is low
- Its initial cost is high and operating cost is high
- Its initial cost is low and operating cost is high
- Its initial cost is low and operating cost is low
Correct answer: 1. Its initial cost is high and operating cost is low
Surge tank is located near
Surge tank is located near:
- Turbine
- Reservoir
- Catchment
Correct answer: 1. Turbine
The draft tube is provided in order to
The draft tube is provided in order to:
- Raise water level
- Increase acting head on water wheel
- Reduce water hammer
Correct answer: 2. Increase acting head on water wheel
Each main water turbine of Three Gorges Dam has a capacity of
Each main water turbine of Three Gorges Dam has a capacity of:
- 100 MW
- 300 MW
- 500 MW
- 700 MW
Correct answer: 4. 700 MW
The specific speed of turbine is defined as the speed at which turbine develops
The specific speed of turbine is defined as the speed at which turbine develops:
- Unit horse power at unit head
- Minimum horse power
- A horse power having value 9.81
- Maximum horse power
Correct answer: 1. Unit horse power at unit head
More Power Generation MCQ
- Power Generation MCQ Part 1
- Power Generation MCQ Part 2
- Power Generation MCQ Part 3
- Power Generation MCQ Part 4
- Power Generation MCQ Part 5
- Power Generation MCQ Part 6
- Power Generation MCQ Part 7
- Power Generation MCQ Part 8
- Power Generation MCQ Part 9
- Power Generation MCQ Part 10