Find the power generated by a 100% efficient hydroelectric power plant having 1 m high head and 1 m^3/s discharge
Find the power generated by a 100% efficient hydroelectric power plant having 1 m high head and 1 m^3/s discharge. (Water density = 1000 kg/m^3)
- 1 kW
- 4.92 kW
- 9.8 kW
- 19.60 kW
Correct answer: 3. 9.8 kW
The specific speeds of Francis, Pelton, and Kaplan turbines in ascending order is
The specific speeds of Francis, Pelton, and Kaplan turbines in ascending order is:
- Pelton, Kaplan, Francis
- Francis, Pelton, Kaplan
- Pelton, Francis, Kaplan
- Kaplan, Pleton, Francis
Correct answer: 3. Pelton, Francis, Kaplan
- Specific speed of Kaplan turbine is 10-30 (approx)
- Specific speed of Francis turbine is 60-300 (approx)
- Specific speed of Kaplan turbine is 300 – 1000 (approx)
*Above values or only an approximate value and aren’t intended to indicate/represent a standard
For low water head of 20 meters, which of the following turbine is recommended
For low water head of 20 meters which of the following turbine is recommended:
- Francis
- Peltom
- Kaplan
Correct answer: 3. Kaplan
The graphical representation of discharge as function of time is known as
The graphical representation of discharge as function of time is known as:
- Hydrograph
- Watergraph
- Monograph
- Load graph
Correct answer: 1. Hydrograph
Reheat cycle in a steam power station is employed to
Reheat cycle in steam power station is employed to:
- Improve performance of condenser
- Reduce heat losses
- Utilize thermal energy from flue gases
- Improve thermal efficiency
Correct answer: 4. Improve thermal efficiency
More Power Generation MCQ
- Power Generation MCQ Part 1
- Power Generation MCQ Part 2
- Power Generation MCQ Part 3
- Power Generation MCQ Part 4
- Power Generation MCQ Part 5
- Power Generation MCQ Part 6
- Power Generation MCQ Part 7
- Power Generation MCQ Part 8
- Power Generation MCQ Part 9
- Power Generation MCQ Part 10