If maximum demand on a power plant is equal to plant capacity, then the value of the load factor is:

  1. Less than plant capacity factor
  2. More than plant capacity factor
  3. Equal to plant capacity factor
  4. None of these

Correct answer: 3. Equal to plant capacity factor